Forecast: Sprinking, Pouring

On a gloomy morning, a cement truck parked alongside the Pyschic Temple to pour foundation.

A pipe ran from the truck, through a pump, and down a pipe that was fed through a hole in the sidewalk where prism glass was once located.

The first portions to be filled were the underpinning.

And then trench lines with rebar.

Finally, the elevator pad.

The crew was still pouring when I left…